Tender number:-
Tendering agent:-
Owner: Chongqing Expressway Group Co., Ltd. Application Deadline: 2009-07-30
Region: Chongqing Industry: Transportation, Water Conservancy Bridge Construction, Electrical and Electronic Equipment, Safety Protection
1. The project of Xinyu and Jieshi Main Line Toll Station of Chongqing Expressway Inner Ring Toll Station Project has been approved for construction and has been included in the capital construction plan. The construction fund shall be self-raised by the enterprise. The project owner Chongqing Expressway Group Co., Ltd. decided to conduct domestic public bidding for the traffic mechanical and electrical engineering of the project, and adopt the qualification review method for the qualification review of the bidder.
2. The traffic project of this project is divided into 1 contract section for bidding, and the construction period is 5 months. The main engineering contents are shown in the table below.
Contract number toll station location number of lanes main project content duration / commissioning period / defect liability period (months)
XJ Expressway K4+705 Xiaoxiang Expressway K82+190
New Jade: 5 in 14 out of bounds stone: 5 in 14 out of charge, communication, monitoring facilities and toll booth lighting facilities. 5/3/24
3. The bidder must have the qualification of independent legal person and have the qualification of contracting communication, monitoring and charging comprehensive system engineering for the highway traffic engineering of the Ministry of Construction. The value of the single contract is more than 10 million yuan from June 2006 to June 2009. The cumulative total amount of highway tolls, monitoring, and communication systems projects of more than 20 million yuan.
4. Interested potential bidders must bring the unit introduction letter, the original business license (copy), the original enterprise safety production license, the original certificate of the enterprise qualification certificate (copy), the original legal representative authorization letter, and the authorized agent ID card. The original and a copy of the above information (with official seal of the company) will be purchased from Chongqing Expressway Group Co., Ltd. from July 6th, 2009 to July 10th, 2009 (no holidays) from 9:00 to 16:30. Documents, bidding documents, each set of cost fee of RMB 1,000 yuan (Â¥: 1000 yuan), the tender is not refunded after the sale.
5. All affiliated enterprises with investment participation relationship, or parent-subsidiary companies with direct management and management relationship, or subsidiaries of the same parent company (central enterprises directly supervised by the State-owned Assets Supervision and Administration Commission of the State Council are not subject to the provisions of this article) The company ") must not apply for the same bidding at the same time.
6. When submitting the bidding documents, a cash deposit of RMB 200,000 (Â¥: 200,000 yuan) shall be submitted in accordance with Article 13 of the Tender Notice.
7. The tenderee unified organization of on-site inspections.
8. Pre-standard meeting time: 10:00 on July 13, 2009 (Beijing time), Venue: Jiangnan Toll Station, 4 km Street, Nan'an District, Chongqing (Electrical Department, 2nd Floor)
9. The deadline for submitting bids is 10:00 on July 30, 2009. Please send one copy of the original and one copy of the bid documents to the location before the deadline and time: Chongqing Expressway Group Co., Ltd. ( No. 66 Yinshan Road, Yubei District)
10. The public opening ceremony will be held at 10:00 on the day of the month of 2009 at Chongqing Expressway Group Co., Ltd. (66 Yinshan Road, Yubei District). Bidders should be represented at their own expense.
Tenderer: Chongqing Expressway Group Co., Ltd. Address: 66 Yinshan Road, Yubei District, Zip Code: 401121
Contact: Fu Wei, Zou Yong Telephone Fax
The advantages of the solution of motorcycle engine starter lithium battery, compared to the traditional lead-acid battery, motorcycle special starting lithium battery in addition to high energy density, there are the following advantages:
1. More environmental protection
Lead-acid batteries are polluted in the production process and may cause pollution if they are not recycled properly. Lithium batteries are green and environmental friendly.
2. Longer service life.
3. Low self-discharge rate, less than 10% per month, lead acid battery can reach 30%.
Starting Lithium Battery,Rechargeable Motorcycle Battery,Motorbike Starter Battery,Motorcycle Starting Battery Deep Cycle,E-motor Starter Battery,Motor Scooter Lithium-ion Battery
Shenzhen Enershare Technology Co.,Ltd , https://www.enersharepower.com